Hilton Abuja
Services by DC PRO : Preparing Schematic Design With Specifications And Estimate Budget Cost And Prepare Risk Analysis Of Hilton Abuja, Nigeria Of Approx. 700 Rooms. Detailed Design For The Replacement Of Old Cooling Towers With A Total Capacity Of 2400 Tons With New Cooling Towers Fitting The Site Unique Criteria. The New Cooling Towers Were Designed With An Industrial Type Control System To Insure Best Operation Management. As Part Of Phase Ii, The Following Items Are Being Covered By Dc Pro: Cooling Tower Replacement Tender Review & Award , Steam & Hot Water System Boiler Replacement Design , New Fuel Oil Tanks And Lpg Tanks Relocation Design , New Electric Generation Power House Design , Critical Onsite Inspections
Size (TR) : 15000
Country : Nigeria